íåáåñíûå êèòàéñêèå ôîíàðèêè â Ìèíñêå
April 28, 2012 – 10:19 am | One Comment

Karachi – the city of lights, a place where many dwell their imaginations and dreams. The beauty of this city has always been in its diversified cultural and ethnic colors. This city has offered to …

Read the full story »
Health & Fitness

helping stay fit with Health news and tips

Religion

Helping understand the role of religions in world

Science & Technology

revealing every news relating to Science and modern technology

Society

Highlighting Social behaviours and issues

International Affairs

Throwing light on International Politics

Home » Economics & Business

4.1 billion WAPDA, Neelum-Jhelum agreement signed

Submitted by Rubab Saleem on May 15, 2008 – 3:57 pmNo Comment

LAHORE: A Rs 4.1 billion agreement for consultancy services for Neelum-Jhelum Hydroelectric Project (NUHEP) was signed between WAPDA and Neelum-Jhelum Consultants, a joint venture of two foreign and three local firms, here at WAPDA House on Thursday. General Manager (NJHEP) Husnain Afzal and Gene J. Kocian signed the agreement on behalf of WAPDA and Neelum-Jhelum Consultants respectively. WAPDA Chairman Shakil Durrani and Member (Water) Syed Raghib Abbas Shah also witnessed the ceremony.

Speaking on the occasion, WAPDA Chairman said that the 969 MW Neelum-Jhelum Hydroelectric Project would be completed in seven years with a total cost of Rs. 130 billion and contribute more than 5 billion units of electricity annually to the national grid. He said that the project would help improve the ratio of hydel electricity in the total generation system of the country. Per unit electricity, generated by the project, will cost only Rs 1.92, which is about three times less than that of the thermal generation.

While thanking the AJK Government, the Chairman revealed that the land for the project has already been acquired. Dilating upon the future hydropower projects of WAPDA, the Chairman said that detailed engineering designs of various hydropower projects with accumulative generation capacity of 25,000 MW are presently at the advance stages. He said that the construction work on the 4,500 MW Diamer-Basha Dam would commence in June next year. Likewise, Kohala Hydropower Project (1,200 MW) and Bunji Hydropower Project (5,400 MW) are expected to start in 2010 and 2011 respectively.-SANA

About Rubab Saleem

Rubab Saleem has written 2672 articles on this journal.

Rubab Saleem is Editor of Pakistan Times

Share and Enjoy:
  • Facebook
  • Twitter
  • Digg
  • Reddit
  • del.icio.us
  • StumbleUpon
  • Technorati
  • LinkedIn
  • PDF
  • RSS
  • Add to favorites
  • email
  • Google Bookmarks
  • NewsVine
  • Yahoo! Buzz
  • Mixx

Popularity: 1% [?]

Leave a comment!

Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.

Be nice. Keep it clean. Stay on topic. No spam.

You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

This is a Gravatar-enabled weblog. To get your own globally-recognized-avatar, please register at Gravatar.

download adobe to cd

student adobe creative suite 5 adobe photoshop download software free download adobe 6 buy cheap download adobe shockwave adobe download free reader

download adobe flash player 8

adobe illustrator buy cheap adobe flash 2004 download download adobe acrobat professional english student adobe illustrator trial download adobe illustrator svg filter download

adobe golive cs2 download

adobe dreamweaver buy cheap adobe flash 8 download adobe flash 8 download buy cheap unable to download adobe flash player adobe version 5 download

download adobe reader cd

adobe fireworks student adobe encore dvd download adobe premiere download student download adobe 8 free adobe photoshop cs 3 download

adobe photoshop download

adobe flash student adobe shockwave download adobe illustrator cs3 crack download student free download adobe lightroom adobe reader download

free download adobe pdf reader

buy cheap adobe acrobat adobe cs2 download free crack key generator free download of adobe photoshop cs3 student how to download pages with adobe flash adobe acrobat writer free download